Safety analysis that examines vehicular and pedestrian high injury networks to update policy, secure funding, and prioritize infrastructure improvements.
View project detailsA Cooling Strategies toolkit that is helping the two cities prioritize where cooling strategies like shade trees, green infrastructure, and cool pavements are needed most.
View project detailsClosing a gap in one of the largest, most wide-ranging urban redevelopment programs in the U.S.
View project detailsA high-profile marketing and outreach campaign to encourage alternative transportation options when a major bridge is closed.
View project detailsDesign and construction of Toronto’s first protected intersection.
View project detailsA transportation demand management plan to help the airport reduce vehicle trips and improve access for passengers and employees.
View project detailsA regional transportation demand management strategy to help CAMPO deliver a program to improve mobility and reduce environmental impacts.
View project detailsA citywide TDM program centered around a TDM ordinance for new developments and tenant improvements.
View project detailsDevelopment and implementation of an airport employee microtransit program addressing the lack of sustainable transportation commute options.
View project detailsPark renovation included synthetic turf field, pickleball courts, tennis courts, walking path, benches, lighting, exercise equipment, comfort station and a greenhouse.
View project detailsAfter internal inspections of JCMUA’s 54-inch Prestressed Concrete Cylinder Pipe Force Main revealed areas of significant corrosion, the Authority retained CME to rehabilitate approximately 2,360 feet of the force main by slip-lining and 700 feet by open-cut methods.
View project detailsConstruction of a Cogeneration Facility to power the entire Treatment Plant, which will provide 100% stand-by power.
View project detailsDrainage and road improvements on Long Branch Avenue from Joline Avenue to South Broadway.
View project detailsCPH is providing Toho Water with program management services to implement this five (5) year Water and Wastewater Capital Plan.
View project details3.2-mile complete street and linear waterfront park with trailheads, overlooks, corridor safety enhancements, and resiliency upgrades.
View project detailsDevelopment of a new water, wastewater, and reclaimed water service area that included a new BNR WWTR and a Reverse Osmosis WTP.
View project detailsCPH is providing Chick-Fil-A full project management, design, and permitting for site and building of standard and specialty solutions.
View project detailsThis 450,000 sf new construction commercial development is located in Orlando, Florida. CPH was the architect of record for the three-phase retail shopping center located near Walt Disney World and the Orlando Vineland Premium Outlets.
View project detailsFaçade renovation of an iconic commercial development in Winter Park, FL.
View project detailsCPH and DRMP are providing master planning, A&E design, and construction administration for the development of a new 36-acre, regional community park in City of Parkland.
View project detailsDRMP provided surveying and mapping/geospatial services to support the replacement of this 10,000-LF runway that is used by the U.S. and United Kingdom.
View project detailsDRMP is providing CEI services for this major interchange improvement project, which will improve congestion and impact thousands of travelers.
View project detailsThe SR 528/SR 436 interchange, a major entrance to Orlando International Airport, is considered a “CFX Signature Project.”
View project detailsWidening this major thoroughfare improved capacity and safety between Orlando’s area attractions and International Airport.
View project detailsThe I-4 at SR 557 Interchange was widened to accommodate the HSR Corridor and the I-4 Master Plan (Ultimate) Typical Section.
View project detailsRKA developed traffic analysis, control of access coordination, and turn lane and intersection improvements along NC 98.
View project detailsGoTriangle aims to provide ADA- compliant amenity improvements throughout the region including sidewalk extensions, shelters, benches, and other amenities.
View project detailsFehr Graham helped the City of Freeport revitalize five blocks of its downtown that serves as a home to downtown festivals and several businesses.
View project detailsFehr Graham helped the City of Crystal Lake improve the Three Oaks Road intersection at Lutter Drive and Sands Road to support housing and retail development.
View project detailsLong-term response to clean up hazardous materiall to complete the Bee Branch Water Shed and Trail Plan in Dubuque, Iowa.
View project detailsFehr Graham works with the Fox Metro Water Reclamation District to update infrastructure.
View project detailsFehr Graham reimagined Manchester Whitewater Park so it could be a place visitors enjoy outdoor adventures year-round.
View project detailsFehr Graham helped the City replace Well No. 34, which had maximum radium contaminant levels and was shut down.
View project detailsFehr Graham was hired to provide safety programs, training and services.
View project detailsFehr Graham helped redevelop a former manufacturing building into an Embassy Suites hotel and convention center.
View project detailsFuss & O’Neill was selected to develop a comprehensive plan and then complete the design of improvements to reduce current and future flood risk, along with management of ~40,000 cy of contaminated material.
View project detailsConducted in-depth analysis of PCBs in indoor air, soil, and building materials, formulating a plan to demolish seven structures to prepare the site for new a high school.
View project detailsFuss & O’Neill developed conceptual designs for the safety and placemaking of a busy corridor
View project detailsCatalyzed successful public-private partnership resulting in a brownfield redevelopment, transit-oriented apartments, and a multi-deal developer relationship.
View project detailsProvides a roadmap for reducing flood and heat risks for communities across Connecticut through identified resilience strategies and actions.
View project detailsDesign for an additional through lane along approximately four miles of I-66, as well as roadway improvements including a new metro ramp, noise walls, a pedestrian bridge, and a roundabout.
View project detailsConstruction of a diverging diamond intersection, bridge widening, major grading, pavement, and multiple gravity retaining walls, 2.05 miles in length.
View project detailsFederally-funded streetscape project included HMA milling and resurfacing, new curb and gutter, storm sewer, and PCC sidewalk.
View project detailsConstruction upgrades include a transfer clearwell with vertical turbine pumps, UV reactors, finished water clearwells, and a high-service pump station to extend life of the existing plant and remove cryptosporidium.
View project detailsProvided preliminary planning, environmental, design and construction engineering for this complex 5-legged intersection.
View project detailsPreliminary and design engineering services were provided to simplify the existing interweaving of multiple expressways, arterial routes and frontage roads.
View project detailsESI provided construction engineering for the rehabilitation of the twin I-74 bridges over the Salt Fork Vermilion River just west of Danville.
View project detailsInterchange ramp improvements that included adding lanes and pedestrian improvements to enhance efficiency and safety for all roadway users.
View project detailsThis was an interchange reconstruction and SR-97 widening project to reduce congestion and improve safety from I-15 west to SR-108. Major work included reconstruction of interchange with multiple structures and road widening over RR.
View project detailsEIS and program management for design-build to improve mobility on I-15 between 600 N in SLC and US-89 in Farmington (~16-mile corridor), repair aging infrastructure, redesign interchanges to accommodate traffic, and provide connected facilities for all user types.
View project detailsFull construction administration services for 1.75 miles of roadway reconstructionalong Las Vegas Boulevard.
View project details170-acre greenfield site requiring 1M CY of fill, 7 miles of roadways, storm drainage collection, culinary water, sanitary sewer systems, 2 MG water tank and pump station, regional gas meter farm, substation, two sewer lift stations, and screening facility.
View project detailsStudy to assess transit mobility needs in and arounddowntown Salt Lake City,and connections from the airport to the University of Utah and Research Park area. Solutions could include Light Rail expansion, BRT, or additional bus stops.
View project detailsThe 111-acre site is one of the most visible industrial properties in Toledo and was purchased by the Toledo-Lucas County Port Authority in 2011.
View project detailsMSG designed the replacement of an aging steel truss structure carrying SR 64 over the Maumee River in the City of Waterville.
View project detailsThis project allowed a brownfield site be revitalized for a new use. This project won a Merit Award for the ACEC/Michigan.
View project detailsRKA developed traffic analysis, control of access coordination, and turn lane and intersection improvements along NC 98.
View project detailsThis project allowed the City to reduce its annual roadway maintenance, improve non-motorized connectivity in the City to nearby parks and replaced an aged watermain that had become a persistent nuisance.
View project details2018 ASHE National Project of the Year under $20M This project realigned the exit and entrance ramps to I-95 at the Temple Avenue interchange and replaced the signalized intersection with a three-lane roundabout.
View project details2024 HCCA Infrastructure Award Winner Progressive Design-Build to replace the West Glebe Road Bridge over Four Mile Run while improving bicycle and pedestrian access by incorporating separated bike lanes and sidewalks onboth sides of the bridge along with an "Art" component.
View project detailsExisting stream crossing replacements at three locations along Otterdale Road at Horsepen Creek, Blackman Creek, and Otterdale Branch.
View project details2018 DBIA National Project of the Year This project reconstructed the I-66/ Route 15 interchange to a Diverging Diamond Interchange (DDI) – the first six-lane DDI of its kind in the Northern Virginia region.
View project detailsDesigned bridge in coastal Louisiana under an accelerated schedule while maintaining access to Port Fourchon and minimizing impacts to wetlands
View project detailsRoadway and bridge improvement design to alleviate congestion and shorten travel time on a busy interstate corridor
View project detailsLed a design-build project to widen I-10 from four to six lanes, easing traffic on a main route between Baton Rouge and New Orleans
View project detailsRestoration of a natural ridge and creation of a marsh/nourishment area to protect the vulnerable south Louisiana ecosystem
View project detailsDeveloped and implemented a complex, multi-system, multi- phase environmentally compliant regional wastewater system
View project detailsRoadway and bridge design to replace old, flood-prone thoroughfare in growing suburb of major metropolitan area.
View project detailsDeveloped a master plan to identify, prioritize, and implement drainage deficiencies throughout the County
View project detailsDevelopment and delivery of data to identify flood-prone areas and increase public awareness for planning and safety purposes
View project detailsManagement of the City’s water and wastewater utility department under a public private partnership agreement.
View project detailsThe new treatment plant was designed with a hydraulic/treatment capacity for average daily flows up to 9 MGD and instantaneous peaks upwards of 40 MGD.
View project detailsManaged EPA-mandated SSO Program to address existing challenges while planning for future sewer infrastructure needs
View project detailsThe new wastewater infrastructure necessary to support the TSMC Facility included 2.1 miles of 36”/60” gravity sewer, a 45 MGD lift station, and 3.2 miles of dual 24” sewer force main crossing I- 17 to connect to the City’s existing wastewater collection system infrastructure.
View project detailsA completely new grit removal process was constructed for the Phoenix 23rd Avenue Wastewater Plant while maintaining the plant operational at all times.
View project detailsCity of Chandler selected Wilson to complete process improvements and equipment upgrades at the City’s two WRFs to add operational flexibility at both facilities.
View project detailsExtensive electrical upgrades were completed including a new Finished Water Electrical Building, new 5kV switchgear, and a New Chlorine Scrubber at the Union Hills WTP, while keeping the plant operational throughout construction.
View project detailsWilson Engineers was selected to complete four Aquifer Storage and Recovery (ASR) Wells to supplement their potable water supplies.
View project details